Update On The Grampians Peaks Trail

We don’t have an update from PV for this issue, but it was good to see the project co-ordinator Anne Wilson on WIN TV explaining that experienced hikers from various bushwalking groups are being asked for input to guide in fine tuning the route. So we fervently hope that some items in the similar ambitious proposal at Mt Hotham don’t get reconsidered here in our Park. The VNPA magazine reports that Parks Victoria, in liaison with Regional Development Victoria, is planning a multi-million dollar revamp of the walking tracks between the Falls Creek and Mount Hotham alpine resorts, with the aim of discouraging use by the current self-sufficient bushwalkers, who they say are low spenders. They are aiming at the ‘high-yield’ luxury market, with the provision of privately built and serviced lodges along the track.

The full ‘Falls to Hotham Alpine Crossing’ is a five day walk, with four overnight … Read the rest

Grampians Peaks Trail Update

From Grampians Tourism’s last newsletter.

Extensive work is continuing behind the scenes, with the planning team focussing on finalising the trail alignment and trailhead designs. Parks Victoria is working with Gariwerd Traditional Owner representatives on designs and other project opportunities, like ways to share cultural stories as part of the walk experience. Project planners have also met with a number of key local groups. This includes being part of onsite inspections with bushwalking clubs to discuss designs for hiker camps and trailheads. Parks Victoria will be working with the wider community on options for some of the key trailheads soon.… Read the rest

Grampians Peak Trail 2015

You may remember that last year’s Winter newsletter had a long report on what was planned for this long distance walk and the FOGG response to the draft proposal. (We supported the trail in principle but were strongly against any building of lodges. All of this is still available on our webpage ). Since then work has continued, and funding announced for the complete trail. ($29 million including $19 million from the state and $10 million from the federal government). On 29 May the Premier came to Halls Gap to officially open Stage 1.

Stage One: Halls Gap to Borough Huts (3 days/2 nights)

This is a three day/two night loop walk from Halls Gap to Borough Huts covering a total of 19 kilometres for the return trip. The track leaves Halls Gap on the southern side of Stony Creek, past Venus baths towards Wonderland Carpark, which it bypasses, heads … Read the rest

Update On The Grampians Peaks Trail March 2015

Margo Sietsma

Prior to the election both parties made firm commitments to the Trail, and it seems assured that the new government will honour the promise.

The plan is to start with upgrading and building in the popular area near Halls Gap. The first section of the walk starts by following Stony creek past Venus baths, with a new section linking to the Pinnacle track (so not going into the Wonderland Car Park). From the Pinnacle it heads towards Mt Rosea Carpark, with a hikers camp site about a kilometre before reaching the road and there will be a separate camp for groups on the other side of Siverband falls Rd.. The Advisory Group visited the site and I was most impressed. The setting is charming, in low forest with views across to the opposite range. All 12 sites are for a 2 person tent on an elevated timber pad … Read the rest

Grampians Peak Trail – The FOGG Response

Friends Of the Grampians Gariwerd (FOGGs) support in principle the proposal for the Grampians Peaks Trail as set out in the Draft Master Plan and as presented recently at public meetings at Halls Gap, Wartook and Dunkeld.

However we do have concerns around the ‘On-walk hiker lodges’. In the document (page 40) it suggests that 3 lodges would be built along the trail initially, but that this could vary with “market forces”. Does this mean that there could later be pressure to build more lodges so this group of users can potentially do the whole walk using this type of accommodation? In some sections of the document one gets the impression that large sections of the trail will be able to be walked using this style of accommodation. With mega fires becoming a regular occurrence in Victoria and the Grampians having experienced 3 large scale fires in the past 8 … Read the rest

Grampians Peak Trail – Project Update May 2014

The trail will be constructed over a number of years in a staged process. The track and hiker campsites form the basis of the core infrastructure necessary. To create the Trail will require the development of approximately 80km of new trail and the upgrade of 64km of existing trails.

Stage One: Halls Gap to Borough Huts

(3 days/2 nights)

Delivery of Stage One is well underway and includes a three day/two night loop walk from Halls Gap to Borough Huts covering a total of 19 kilometres for the return trip. This stage is being delivered by Parks Victoria through $1.3M in funding provided on behalf of the Victorian Government by Regional Development Victoria.

 Stage One achievements to date:

  • An 8.7km track realignment from Mt Rosea to the Belfield Fire Line is complete;
  • Development of a design manual which sets a consistent style for tracks, bridges, signs and hiker camping areas
Read the rest

THE LONG DISTANCE WALK Proposed Grampians Peak Trail: Margo Sietsma 2011

Grampians Peak Trail Proposal

In the last issue I reported that the Advisory group had discussed the first stage of the long distance Grampians Peak Trail, which will be a 3 day circuit from Halls Gap, to Mt Rosea area, to Borough Huts area, and back to Halls Gap.
FOGGs were briefed on the plan at our meeting with Dave in August. Government funding for the planning and development of Phase 1 including up to 3 hiker camps and new track development has been secured – $2.3million. New walk in camp sites will be established, one near the old campsite at Mt Rosea, but hidden from the road, and one off Redman Rd similarly secluded. They will probably consist of pads for BYO tents, toilets, fire places, and a basic shelter. Camp sites will need to be booked, at a fee. There are no plans for private investment. It is … Read the rest

Friends of Grampians Gariwerd